•  

     

    • 242.png
    • 241.png
    • 240.png
    • 239.png
    • 238.png
  • Union Pacific Bridge Replacement Project Kick Off

    • Share:
    Union Pacific Bridge Replacement Project Kick Off

     
    MEDIA CONTACT: Kristen South at kmsouth@up.com or 402-544-3435
     

     
    Union Pacific Bridge Replacement Project Kick Off
    Limited Use During Construction for Recreational Users
     
    Union Pacific will begin construction of a new bridge over the Elkhorn River Sept. 27 in Arlington, Nebraska. The new structure will be located approximately 700-feet upstream from the existing bridge.
     
    The area is well-known for hunting and fishing. Recreational users will have limited access to a temporary bridge to cross the river during construction. The temporary structure also will aid in the construction efforts, which are anticipated to last through early Spring 2022.
     
    Once the new bridge is completed, the temporary structure and old bridge will be removed. Notifying recreational users about the construction is part of the permitting process outlined by the U.S. Army Corps of Engineers.
     
    Contact:
    Jordan Rishel, IOM, Executive Director
    Jordan@Washingtoncountychamberne.com, (402) 533-4455